Medical Device R&D Project of Suda Test


Customer


Suda Test

Location


Jiangsu,China

Overview

The project is located in Suzhou City, with a construction area of ​​5,500m². It comprises two buildings, Building 11 and Building 12. Building 11 is the laboratory area with a construction area of ​​3,000 square meters. The fourth floor of Building 12 is the entire animal room area, which includes multiple laboratories, operating rooms, and the barrier environment of the animal center, including large and small animals. The project requires cleanliness and energy saving.

Our Solution

HUBER & RANNER provided our customized AHU’s for the animal room area of the facility. All units operate in 100% fresh air mode, with a total air volume of about 220,000 m³/h. A total of 5 sets of three-coil KVS run-around coil energy recovery systems were also supplied to the project, including intelligent control stations which can detect the quantity of heat recovery in real time and save energy significantly. The AHU fans were designed as redundant duty/standby systems to guarantee 24/7 operations.

Design Points

Animal lab area employs fully redundant duty/standby fan systems
The KVS counterflow heat recovery coil is imported from Belgium, with high heat recovery efficiency achieving increased energy saving;
The AHU internals are treated with an antibacterial coating, which can effectively inhibit bacterial growth, and the unit is resistant to ozone aging;
The depressed drain tray ensures that condensed water can be drained smoothly at its lowest point to reduce the risk of bacterial growth.

Diese Website verwendet Cookies.
Wir verwenden Cookies, um Inhalte und Anzeigen zu personalisieren, Funktionen für soziale Medien anbieten zu können und die Zugriffe auf unsere Website zu analysieren.
获取项目报价
订阅我们的资讯

Cookies设置

核心条款

这些cookie是必需的,您不能拒绝它们。它们确保了服务的稳定性以及正确和安全的运行。示例:身份验证cookie、安全cookie、多媒体播放器会话cookie、负载平衡cookie、“用户输入”cookie、首选项设置。

定制体验和市场营销(可选)

目标cookie收集用户的信息,并使用它来构建用户兴趣的配置文件,以显示特定用户的个性化内容。它们通常在合作伙伴之间共享,并在多个网站上跟踪用户。